机构地区:[1]成都理工学院水文系,四川成都610031 [2]西南交通大学土木工程学院,四川成都610031
出 处:《西南交通大学学报》2000年第1期23-27,共5页Journal of Southwest Jiaotong University
摘 要:成渝铁路典型路基边坡由砂泥岩互层及其风化带组成,顶部为2~5m的砂粘土层。模拟实验表明,边坡对降雨过程的水力学及力学响应取决于土层的初始渗透性、降雨方式和降雨量;能够对边坡渗流场和应力场产生明显影响的降雨过程一般应同时满足3个条件:(1)雨前经历过较长时间的炎热天气,土层蒸发强烈、初始渗透性良好;(2)降水过程以中到大雨开始,且持续较长时间;(3)降雨时间长。The typical subgrade slope of Chengdu Chongqing railway is made of sandstone mudstone layers and its weathering zones are covered by a sand layer with a thickness of 2~5 m. Simulation tests indicate that the hydraulic and mechanical responses of the slope to a rainfall process is influenced by the initial permeability of the sand layer, the rainfall style and the rainfall amount. The rainfall process which can have a remarkable influence on the seepage field and stress field of the slope should satisfy the following requirements simultaneously: (1) due to a long time of hot weather before rain, the soil layer is intensely evaporated and its initial permeability is good; (2) the rainfall process begins with a moderate or a heavy rain, and continues for a long time; and (3) the rainfall lasts a long time, and the rainfall amount is great.
分 类 号:U213.13[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.66