机构地区:[1]中国水电基础工程局有限公司,天津301700 [2]长江水利委员会工程建设监理中心,湖北武汉430010
出 处:《人民长江》2012年第11期34-39,共6页Yangtze River
摘 要:在西藏拉萨河旁多水利枢纽坝基158.47 m深防渗墙的施工中,结合地层、施工强度、设备能力等综合考虑,采用"钻抓法"局部结合"钻劈法"造孔成槽。为提高泥浆固壁效果,选用了一种新型的JCJ/MMH正电胶泥浆;墙体连接施工采用接头管法。对施工过程中松散易塌地层、粉细砂地层、孤石层的处理,孔形、孔斜的控制等作了详细介绍。可供同类工程参考。The deep cutoff wall with the depth of 158.47m of the dam foundation of Pangduo Hydropower station on Lasa River in Tibet is constructed by considering the factors such as the stratum, construction intensity and capacity of equipment compre- hensively. We adopted drilling - grabbing method, together with drilling - splitting method partly to make the holes into grooves. The new - type JCJ/MMH drilling slurry was selected to improve the slurry effect of fastening to the wall and the jointing pipe method was adopted during the construction of connecting walls. Furthermore, the treatment of loose and easily - collapsed stra- tum, silty sand stratum and boulder stratum during the construction, as well as the hole shape and hole deviation are all intro- duced particularly. The construction technology can be a reference for similar projects.
分 类 号:TV543.8[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145