钢筋锚固板在核电工程中的应用研究  被引量:2

The application for headed rebar in nuclear power plant

在线阅读下载全文

作  者:储艳春[1] 王涛[1] 

机构地区:[1]上海核工程研究设计院,上海200233

出  处:《四川建筑科学研究》2012年第3期74-78,共5页Sichuan Building Science

摘  要:钢筋锚固板为锚固板与钢筋构成的组件。基于ANSYS探讨了钢筋锚固板的受力机理;对比了中美规范对带钢筋锚固板锚固长度的相关规定,推导出了锚固长度建议公式;统计某核电厂核岛辅助厂房与屏蔽厂房拉筋材料用量,研究了采用钢筋锚固板替代普通弯钩的经济性及可行性。研究表明:在工程结构中采用钢筋锚固板代替弯钩完全可行,且具有良好的安全性和经济性,可在工程建设中推广应用。Headed rebar is an assembly composed by steel plate and rebar. Based on ANSYS software,the force mechanism for headed rebar was researched. The development length for headed rebar in relevant codes of China and America was compared and analyze, recommended value for development length was given. Relying on a nuclear power project, the amount of tie bar for Auxiliary Building and Shield Building was counted. And the economic performance and feasibility of substituting rebar with hook by headed rebar was researched. The results show that: substituting rebar with hook by headed rebar in engineering structures is feasible with good safety and economic performances. It can be popularized in various kinds of projects.

关 键 词:钢筋锚固板 受力机理 锚固长度 核电工程 经济性 

分 类 号:TU375[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象