电容器连接组件过热原因分析与设计改进  被引量:12

Analysis and Design Modification on Overheating in the Connected Component of Capacitor

在线阅读下载全文

作  者:黄斌[1] 苏文宇[1] 刘小波[1] 徐姗姗[1] 徐珍[1] 

机构地区:[1]江西省电力公司检修分公司,江西南昌330029

出  处:《电力电容器与无功补偿》2012年第3期40-43,共4页Power Capacitor & Reactive Power Compensation

摘  要:TBB24-35-60120/334-2BLW型电容器装置广泛应用于江西500 kV变电站内,该型电容器组连接组件存在结构性缺陷,经常出现单台电容器连接组件过热问题。为保证电网安全,分析该型单台电容器连接组件结构,设计出新型单台电容器连接组件并在现场成功实施更换改造。因此建议用50平方BV线代替原有35平方多股细软铜线;用SBK-1-M16型变压器专用线夹代替原有引线接头;引线在安装时注意留出存水弯。TBB24-35-60120/334-2BLW capacitor installations are widely used in Jiangxi Province 500 kV substations. The structural defects in the connected component of this type of capacitor banks always cause overheating fault in the connected component of capacitor. To guarantee the safety of power grid, the internal structure of this connected component of capacitor is analyzed, a new type of connected component is designed and used successfully at site. It is suggested to use 50 mm2 BV ca- bles instead of the original 35 mm2 soft copper cable and SBK-1-M16 special transformer clamp in- stead of original lead connector. And the trap in lead installation shall be maintained.

关 键 词:电容器 连接组件 改良设计 

分 类 号:TM531.4[电气工程—电器]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象