撤除外熔丝消除保护误动  被引量:4

Elimination Protection Malfunction by Removal of External Fuse

在线阅读下载全文

作  者:夏长根[1] 杨帆[1] 

机构地区:[1]中国南方电网超高压输电公司,广东广州510620

出  处:《电力电容器与无功补偿》2012年第3期65-68,共4页Power Capacitor & Reactive Power Compensation

摘  要:分析了宝安站35 kV并联电容器外熔断器误动的原因,比较了外熔断器和内熔丝的运行特点。针对宝安站并联电容器的具体情况,分析了取消外熔丝、只使用内熔丝和继电保护的可行性,并以单芯电缆替换原先的外熔断器对电容器组进行改造,经过一年多时间运行检验,说明该方法有效可行,提高了电容器运行可靠性,减轻了运行维护工作量。The cause of malfunction of external fuse of 35 kV shunt capacitor at Bao'an station is ana- lyzed and operating characteristics of external fuse and internal fuse is compared. For the specific cir- cumstance of shunt capacitor at Bao'an station, the feasibility of removing external fuse and only u- sing the internal fuse and relaying protection. The capacitor bank can be modified by way of repla- cing original external fuse with single core cable. Through more than one-year operation, it is proved that the method is feasible, the operation reliability is improved and the maintenance work is re- duced.

关 键 词:电容器 内熔丝 外熔断器 不等臂双星形接线 不平衡电流保护 

分 类 号:TM53[电气工程—电器]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象