基建项目投资清理后的清概分劈、末次计价及移交组固工作  

Budget Estimate Clearing and Splitting、the End Time Valuation and Handing Over Solid Group Work After Infrastructure Project Investment Cleaning

在线阅读下载全文

作  者:丁宇坤[1] 陈培红[1] 杨虹[1] 

机构地区:[1]呼和浩特铁路局建设管理处,内蒙古自治区呼和浩特010030

出  处:《铁路工程造价管理》2012年第3期39-41,共3页Railway Engineering Cost Management

摘  要:为使铁路基建项目合理有效地履行竣工决算、转固销号程序,需要对项目投资清理后进行清概分劈、末次计价及移交组固工作。这项工作操作繁杂、业务性强、责任重大。此文从工作前提与背景、工作原则、工作内容、遗留问题与建议等4个方面进行认真思考和分析,旨在依法合规履行建设程序,规范投资控制行为,为投资清理后的决算、销号工作起到抛砖引玉的作用。To reasonablely and effectively fulfill the final accounts of the completed project and fixed assets transfer and number abolishing, the budget estimate clearing and splitting,the end time valuation and handing over solid group work after infrastructure project investment cleaning shuold be done. The work operates multifarious, has strong business and significant responsibility. The four aspects that the job premise and background, work principle, work content, the problem and suggestions are seriously considered and analyzed in this article to perform in accordance with the construction procedure, regulate investment control behavior.

关 键 词:基建项目 清概分劈 末次计价 移交组固 

分 类 号:F284[经济管理—国民经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象