机构地区:[1]中国民航机场建设集团公司,北京100101 [2]北京市建筑工程研究院有限责任公司,北京100039
出 处:《施工技术》2012年第6期99-101,共3页Construction Technology
摘 要:某大型站房结构采用了逆作法施工方案,即先施工屋顶钢结构,然后再施工下部轨道梁、落客平台及高架层结构。为了研究逆作法施工和后期预应力混凝土梁张拉对屋顶预应力钢结构的影响,建立整体模型,按照实际逆作法施工顺序进行了施工模拟计算,并与一次加载模型结果进行了对比分析,从而确保了结构的成型状态与设计相符。The main building of a railroad station is built with reverse construction. The steel structures of roof are constructed first, and then the rail beams, drop-off platform and overhead floor. In order to investigate the impact on the prestressed steel structures of the roof for the reverse construction and prestress tension of the concreet beams, the integral model is built, and construction simulation is conducted, and the results are compared with those of one time loading simulation, the structural shape conforms to design shape.
分 类 号:TU753[建筑科学—建筑技术科学] TU757
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117