CAD与EXCEL的深层开发在高桩码头沉桩中的应用  被引量:1

In-depth Development of CAD and EXCEL and Their Application in Pile Driving for Piled Wharf

在线阅读下载全文

作  者:李辉 杜建钢 

机构地区:[1]中交一航局第一工程有限公司,天津300456 [2]中交第一航务工程局有限公司,天津300461

出  处:《中国港湾建设》2012年第3期22-24,共3页China Harbour Engineering

摘  要:主要介绍了CAD、EXCEL软件VB二次开发的打桩一键通软件,该软件在高桩码头桩基工程中可"全自动"、"全智能"绘制桩位图、碰桩图,并且根据碰桩条件自动检查碰桩情况。大量减少了技术人员的复核验算工作,通过一个按键使打桩技术中的计算、绘图变得简单、方便。This paper mainly introduces an "e-touch" pile driving software based on the in-depth development of CAD and EXCEL by using the Visual Basic (VB) program, which is used for automatically and intellectually drawing diagrams for pile locations and pile collision in pile driving for piled wharfs, and checking automatically the state of pile collision according to the programmed pile collision conditions. It greatly reduces people's work volume in re-checking and checking calculations and makes it easier and more convenient for calculating and drawing for pile driving by using one button.

关 键 词:CAD EXCEL VB 深层开发 碰桩验算 

分 类 号:U656.113[交通运输工程—港口、海岸及近海工程] TU473.12[交通运输工程—船舶与海洋工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象