检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]厦门市建设与管理局,福建厦门361003 [2]江苏时代建筑设计有限公司,福建厦门361012
出 处:《福建建筑》2012年第6期95-98,共4页Fujian Architecture & Construction
摘 要:冲孔灌注桩受施工工艺影响,即便持力层是坚硬岩土层,其受力仍表现为摩擦桩的性状,当受荷接近其极限承载力时,其工作状态为塑性支承状态。以厦门某工程为例,介绍了基于塑性支承桩概念的冲孔灌注桩复合桩基的设计方法,提出了设计建议,供工程设计人员参考。Punched cast--in--situ pile affected by the construction process, even if the bearing stratum is a layer of hard rock, still showed its charac- teristics of friction piles. When the load bearing capacity is close to its limits, its Working status is the plastic bearing state. An Example of a project in Xiamen is given to describe the design method of composite punched cast--in--situ pile foundation based on the concept of plastic bearing pile, and also some design proposals are made for reference.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.129.92.14