检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长江水利委员会设计院,湖北武汉430010 [2]长江水利委员会南水北调中线工程项目办公室,湖北武汉430010
出 处:《人民长江》2000年第5期10-11,共2页Yangtze River
摘 要:南水北调中线总干渠线路长、供水范围广 ,沿线分水口门多 ,做好总干渠的运行控制十分必要。闸前常水位和控制容量方式是中线最合适的控制方式。根据中线工程总体设计成果 ,分别为这两种运行方式研制渠道控制计算模型。由用水户的分水流量和计算模型可以计算出渠道节制闸的最终闸门开度 。The main trunk channel of the Middle Route Project for South-to-North Water Transfer has a long route,a vast water supply district and numerous water-diverting outlets along the channel,so it is necessary to well operate and control the main trunk channel.Maintaining constant water levels at sluices and controlling water storage capacities of all channel reaches are the most suitable control modes.Based on the general design results,two computation models for controlling the channel flow by means of maintaining constant water levels at sluices and controlling water storage capacities of channel reaches are developed.The gate opening of a regulating sluice can be determined by the computation model and according to diversion discharges of water users.The computation model can be used for the water supply regulation.
分 类 号:TV131.61[水利工程—水力学及河流动力学] TV68
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.80