检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:马珏伟[1]
机构地区:[1]上海市政工程设计研究总院(集团)有限公司,上海200092
出 处:《中国市政工程》2012年第3期10-11,102-103,共2页China Municipal Engineering
摘 要:传统城市高架道路接地匝道往往存在交织段较短、交通负荷较重、交叉口拥堵情况严重等问题。针对这些问题,提出了一种剪刀叉式接地匝道设计方案,即在单侧高架道路上先布置下匝道,再布置上匝道,在立面上,先下后上的2根匝道形成"剪刀叉"的形态,在平面上2根匝道并列布置,其中1根匝道布置在道路内侧,另1根匝道布置在道路外侧。高架道路的另一侧也按此方法布置匝道,避免高架道路车流的短距离交织运行,同时也使地面交叉口最多只面对2根匝道,减轻了地面交叉口的交通负荷,改善了运行情况及服务水平。There are many problems appeared in traditional urban viaduct road grounding ramp,such as shorter weaving section,heavier traffic load and intersection congestion,etc.Aiming at these problems,a design plan of cut knife & fork-typed grounding ramp is proposed,that is,off-ramp is set up firstly on the one-sided viaduct road,on-ramp secondly.The two ramps will form the type of cut knife & fork in the facade and be parallel in the plane,one ramp inside and the other one outside of the road.Meanwhile,the other side of the viaduct also uses this ramp layout to avoid short distance weaving running of traffic flow,to make ground intersections meet two ramps in the maximum,to relieve the traffic load of ground intersections and to improve the running condition and service level.
分 类 号:U412.352.12[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117

