汶川地震紫坪铺面板堆石坝地震波输入研究  被引量:21

Study of seismic wave input of Zipingpu concrete face rockfill dam during Wenchuan earthquake

在线阅读下载全文

作  者:孔宪京[1,2] 周扬[2] 邹德高[1,2] 徐斌[1,2] 

机构地区:[1]大连理工大学海岸和近海工程国家重点实验室,辽宁大连116024 [2]大连理工大学建设工程学部水利工程学院,辽宁大连116024

出  处:《岩土力学》2012年第7期2110-2116,共7页Rock and Soil Mechanics

基  金:国家自然科学基金重点项目(No.51138001);国家自然科学基金委创新研究群体基金(No.51121005);国家自然科学基金重大研究计划项目(No.90815024);国家自然科学基金青年科学基金项目(No.50908032);中央高校基本科研业务费专项资金(No.DUT11ZD110;DUT12LK37)

摘  要:对国家强震动台网中心紫坪铺面板堆石坝区域台站实测主震记录以及大坝台网实测余震记录进行分析,研究主震与强余震地震动的基本特征。分别选取茂县地办、郫县走石山、成都中和这3组基岩台站实测主震地震动,紫坪铺台站2008年11月6日实测余震地震动以及按水工抗震规范人工生成地震动作为数值计算的地震动输入,对紫坪铺大坝进行三维动力有限元分析,并与实测结果进行对比。研究表明,郫县走石山与成都中和2个远场台站位于断层下盘,其实测地震动的加速度反应谱长周期(0.65 s以后)分量过于丰富,不宜作为断裂带附近紫坪铺大坝的地震动输入;紫坪铺大坝台站实测的余震地震动1 Hz附近(大坝基频)的频率成分相对较少,且持续时间较短,以至于难以激发大坝响应;对比坝顶实测地震动加速度反应谱和数值计算反应谱,建议汶川地震中紫坪铺大坝动力计算时可采用茂县地办台站实测地震动或按抗震设计规范反应谱人工生成地震动。The main shock measured by stations of China strong motion networks center(CSMNC) around Zipingpu concrete face rockfill dam(CFRD) and the aftershock measured by Zipingpu stations are analyzed.The basic characteristics of strong ground motions are studied.Three-dimensional dynamic finite element analysis is adopted to analyze Zipingpu CFRD while the main shock measured by stations like Diban of Mao county(DBM),Zoushishan of Pi county(ZSP),Zhonghe of Chengdu(ZHC) and recorded aftershock of rock stations on dam site on Nov.6,2008 and artificial ground motion generated by standardized spectrum of specifications for seismic design of hydraulic structures as seismic input;and then comparison between the finite element data and the measured data is made.It is shown that the long period component(0.65 s later) of response spectrum of ground motion recorded by stations of ZSP and ZHC is much too rich as these far-field stations locate in the footwall of fault.As Zipingpu dam locates near the fault,main shock recorded by far-field stations can not be used as seismic input.The components in the range of about 1 Hz(base frequency of the dam) of the aftershock recorded by stations of Zipingpu dam are lower and the duration is less so that it is difficult to stimulate the dam.Compared with measured and calculated spectra on dam crest,ground motions measured by Diban station of Mao county and artificial ground motion generated by standardized spectrum are suggested to be used in dynamic analysis of Zipingpu dam during Wenchuan earthquake.

关 键 词:紫坪铺面板堆石坝 汶川地震 地震波输入 有限元法 

分 类 号:TV312[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象