哈尔滨南岗会堂增层改造设计  被引量:5

Structure design for adding storeys of Harbin nangang hall

在线阅读下载全文

作  者:郑文忠[1] 王英[1] 刘思嘉[1] 

机构地区:[1]哈尔滨工业大学土木工程学院,哈尔滨150090

出  处:《哈尔滨工业大学学报》2012年第6期45-50,共6页Journal of Harbin Institute of Technology

基  金:国家教育部长江学者奖励计划资助项目(2009-37);黑龙江省科技攻关项目(GC09C205);黑龙江省科技推广项目(TC10A0101)

摘  要:为解决增层改造施工过程影响既有建筑正常使用的问题,结合哈尔滨南岗会堂增层改造工程,研究了既有房屋套建巨型框架增层的设计方法与施工措施.巨型框架选用悬挂结构体系,次框架的竖向荷载通过吊柱传至主框架.主框架由内置H型钢预应力混凝土组合梁和角钢混凝土柱组成,次框架由型钢混凝土梁和型钢混凝土柱组成,施工阶段采用自承重现浇混凝土结构体系,实现既有建筑在施工过程中的正常使用.To solve the problem of that the construction process for original buildings story-adding prevents its usual work,taking Harbin Nangang Hall as demonstration,the adding project of huge frame including main frame around old buildings and sub frame is studied.The vertical load is transmitted from sub frame to main frame by the davit.The main frame is composed by prestressed concrete beams with encased H-steel and angle-steel concrete columns,and the sub frame is composed by encased steel beams hanging and encased steel columns over the huge frame.Design and construction methods of self-supporting concrete structure are presented to ensure that original building works as usual during the construction.

关 键 词:套建增层 巨型框架 角钢混凝土柱 组合梁 

分 类 号:TU378.4[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象