YR-3井井身井管结构设计及固井技术  被引量:9

Design of Casing Program for YR-3 Well and the Cementing Technique

在线阅读下载全文

作  者:刘文新[1] 张长茂[1] 鲍洪智[1] 李砚智[1] 宋少辉[1] 

机构地区:[1]河北省地矿局第三水文工程地质大队,河北衡水053000

出  处:《探矿工程(岩土钻掘工程)》2012年第6期35-38,共4页Exploration Engineering:Rock & Soil Drilling and Tunneling

摘  要:以YR-3井为例,阐述了牛驮镇地热田从下伏石灰岩-白云岩完整地层钻取地热水时的多级成井结构及固井技术。该技术可有效地克服因地层漏失造成的孔壁坍塌及因设备能力偏小而造成的固井困难。经多眼井施工证明,该方法是牛驮镇地热田及类似地层地热井施工的有效方法。With the example of YR - 3 well, the paper discussed the muhilevel well completion structure and cementing technology of drilling for geothermal water in underlying limestone-dolomite complete formation of Niutuozhen geothermal field. With this technology, borehole collapsing caused by circulation loss and cementing difficulties due to low equipment capacity can he effectively solved. Construction of several wells proved that it is a successful and effective method for Niutuozhen geothermal field and the similar ones.

关 键 词:地层漏失 坍塌 多级成井结构 水泥固井 

分 类 号:TE249[石油与天然气工程—油气井工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象