检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国南方电网电力调度控制中心,广州510623
出 处:《南方电网技术》2012年第A01期1-3,共3页Southern Power System Technology
摘 要:为了节省用地和降低工程造价,云广直流工程与贵广Ⅱ回直流工程在广东省内共用一个接地极。基于直流过负荷逻辑和接地板过流保护分析了共用接地极的过流风险,指出在两回直流同名极同时跳闸且运行极均短时过负荷运行时,将会出现共用接地板电流超过最大耐流值的情况。针对这种过流风险,从调度运行层面上提出调控措施及彻底解决问题的建议。For terra saving and cost reducing, Yunnan-Guangdong DC project uses a common grounding electrode with Guizhou-Guangdong II DC project in Guangdong province. Based on DC overload logic and grounding electrode overcurrent protection, this paper analyzes the overcurrent risk in the common grounding electrode, pointing out that the current of common grounding electrode will exceed the maximum resistance value in the case where the same-name poles of the two DCs trip at the same time while the remaining running-poles are in overload operation in a very short time. Against the risk, the control measures are proposed from the view of dispatching operation, and correlative recommendations are made to solve completely the problem.
关 键 词:云广直流工程工程贵广Ⅱ回直流共用接地极风险分析
分 类 号:TM721.1[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117