检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:彭柏兴[1,2] 何天铭[3] 王会云 肖宏宇[2]
机构地区:[1]长沙市勘测设计研究院,湖南长沙410007 [2]长沙理工大学岩土与隧道工程系,湖南长沙410004 [3]中铁隧道集团有限公司,河南洛阳471009
出 处:《交通科学与工程》2012年第2期67-71,共5页Journal of Transport Science and Engineering
基 金:湖南省自然科学基金项目(07JJ3104)
摘 要:盾构是穿越江河水下隧道的主要工程方法之一.针对南湖路湘江隧道盾构段围岩中岩溶具有成岩差、易软化、崩解以及石英质和砾石含量高特性的红层软岩、上软下硬的浅覆土等特征,分析了复杂地质条件下盾构施工的风险,提出了应对措施,其结果可为南湖路湘江隧道的设计和施工提供指导性建议.Shield surroundings of been analysised, tunneling is a major construction method to cross rivers. The special Xiangjiang River tunnel whose shield is a crossed in Nanhu Road have which includes karst caves, "red strata" with the features of weak dia- genetic process, suspcetible to be softened and can be easily disingtegrated,high content of Quartz and gravel and "upper-soft and lower-hard" stratum with small thickess of covering. After risks are analyzed for shield tunnel construction under these complex geological conditions, some measurments are put forward. The study can provide an in- structional reference to both design and construcation of the Changsha Xiangjiang tunnel at Nanhu Road.
分 类 号:O319.56[理学—一般力学与力学基础]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222