作 者:范芝宇[1,2] 邵鹏[1,2] 周利芬[1,2] 蔚立元[1,2] 苏海健[1,2]
机构地区:[1]中国矿业大学深部岩土与力学地下工程国家重点实验室,江苏徐州221008 [2]中国矿业大学力学与建筑工程学院,江苏徐州221116
出 处:《工程爆破》2012年第2期42-45,64,共5页Engineering Blasting
基 金:青年科学基金资助项目(51109209);中央高校基本科研业务费专项资金资助(JX11174)
摘 要:由直立边坡控制爆破振动测试数据的拟合分析,结合冲击作用下地下管道的动力响应推导,研究了直立边坡控制爆破对地下输油管道的影响。结果表明,爆破塌落体触地时对地面的冲击振动大于炸药爆炸本身引起的地面振动,得出了影响冲击振动强弱的相关因素,并根据分析结果对原有爆破方案进行优化,保证了爆破施工安全与效果。Influence of controlled blasting of vertical slope on buried pipeline was studied by fitting analysis of blasting vibration date and dynamic response derivation of buried pipeline under impact. The results show that the ground vibration caused by collapse was larger than that caused by explosion itself, and the relative factors that affected vibration strength were obtained. The original blasting scheme was improved according to analysis results, which ensured construction safety and blasting effect of the project.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.143