检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《上海公路》2012年第2期28-31,11,共4页Shanghai Highways
基 金:福建省交通科技发展项目(200911)
摘 要:连续刚构桥长悬臂施工状态结构具有大、轻、柔的特点,阻尼下降,因而对风的作用十分敏感,风致振动对结构影响较大。在研究国内外连续刚构长悬臂状态下抗风临时措施应用基础上,针对某海峡大桥长悬臂施工状态提出五种抗风临时措施,建立有限元模型比较不同措施下风槽钢连接的措施能最大程度降低结构响应,大大提高结构抗风性能,这对连续刚构长悬臂施工状态风振控制具有一定的借鉴意义。Long-span continuous rigid frame bridge is large,light and soft during cantilever construction state,and is very sensitive to wind load by the damping decreases obviously.The vibration induced by wind impact on the structure response greatly.Based on a survey of the application of wind-resistant measures for the continuous rigid frame bridge under long cantilever construction state,5 feasible wind-resistant measures are put forward.The finite-element models of a certain straits bridge are established to calculate the influences of key structural performance applying different wind-resistant measures.It is shown that the displacement of the structure decreases when temporary wind-resistant measures are applied.Structural response decreases most when connecting the two girders by channel steel,contributing a lot to the wind-induced vibration control during cantilever construction.
关 键 词:桥梁工程 抗风临时措施 有限元方法 连续刚构 长悬臂施工状态
分 类 号:U445.466[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30