检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:余健明[1] 高虎成[1] 田文博[1] 周波[1]
机构地区:[1]西安理工大学自动化与信息工程学院,陕西西安710048
出 处:《西安理工大学学报》2012年第2期183-188,共6页Journal of Xi'an University of Technology
摘 要:研究了风力发电系统并网后配电网无功优化问题,将年负荷持续曲线处理为五种负荷运行方式,考虑风电机组输出功率的波动性,以年电能损失费用与无功补偿设备的投资费用之和最小为目标函数,以功率平衡、过补偿约束、电压合格、馈线电流约束为约束条件,应用改进的离散粒子群算法(PSO-GA)优化并联电容器组的安装位置和容量。仿真结果证明了该优化策略的有效性及经济性。Reactive power optimization problem in distribution system with wind power system is analyzed in this paper.The load duration cure is approximated with five load levels,considering wind power volatility.In the objective function,the sum of power loses cost and new adding shunt capacitor devices investment divided in each year are considered,and power balance,over compensation,satisfaction voltage quality are the constraints conditions.The improved discrete particle swarm algorithm(PSO-GA) is adopted to optimize placement and sizing of shunt capacitors.The simulation results indicate that method proposed for the optimization problem is effective and economical.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15