1000kV淮上线特高压钢管塔重型构件索道运输  被引量:4

Cableway Transportation for Heavy Component of Steel Tube Tower in 1 000 kV UHV Transmission Line (Huainan to Shanghai)

在线阅读下载全文

作  者:丁宗保[1] 黄成云[1] 朱立明[1] 刘承志[1] 朱冠旻 

机构地区:[1]安徽送变电工程公司,合肥市230022

出  处:《电力建设》2012年第7期99-101,共3页Electric Power Construction

摘  要:为了解决1000kV淮南—上海特高压交流输变电工程施工中存在的运输难题,提出了2×多跨双索单牵引循环式索道运输方案。针对不同的荷载量,该索道运输方案分为独立运输方式、联合运输方式和拆分运输方式。试验结果表明,该索道运输方案是有效的,可为相关工程提供参考。In order to solve the transportation difficulties in 1 000 kV UHV AC transmission engineering construction ( Huainan to Shanghai), this paper put forward a transportation program of 2 × multispan circulation cableway with double cable single type. According to the different load quantities, this cableway transportation program divided into independent mode, combined mode and split mode. The testing results show that the cableway transportation program is effective, which can provide reference for related projects.

关 键 词:钢管塔 重型构件 山地和丘陵地区 索道运输 

分 类 号:TM75[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象