检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王作颖[1] 刘晓成[1] 王史文[1] 薄涛[1] 张乃峰[1]
机构地区:[1]胜利石油管理局现河采油厂,山东东营257068
出 处:《西安石油学院学报》2000年第3期16-18,共3页Journal of Xi'an Petroleum Institute
摘 要:为在稠油热采蒸汽驱阶段提高注汽干度 ,进而提高稠油开采率 ,引进了高压汽水分离器 .但高压汽水分离器是一个耗能设备 ,它的关停是决定注汽成本的一个关键性问题 .本文通过整体效益分析 ,认为汽水分离器的启停主要取决于注汽管网的长度 .During viscous crude oil steam flooding,a high pressure steam water separator is introduced to improve steam quality and then enhance recovery factor.But because it is a energy consumption equipment,there is no benefit to the whole steam injection system with it.So whether to run or shut it is a key point to steam injection cost.According to integrated benefit analysis of steam injection system,it can be concluded that running or shutting high pressure steam water separator mainly depends on the length and well spacing of steam injection pipe network.
分 类 号:TE357.44[石油与天然气工程—油气田开发工程] TE934.5
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229