石门坎大坝栈桥桥墩爆破倾倒历时及振动效应分析  被引量:3

Toppling Duration and Vibration Effect Caused by Blasting of Hydraulic Trestle Pier

在线阅读下载全文

作  者:占学军[1] 任贤斌[1] 张晓平[1] 

机构地区:[1]长江科学院水利部岩土力学与工程重点实验室,武汉430010

出  处:《长江科学院院报》2012年第7期41-44,共4页Journal of Changjiang River Scientific Research Institute

摘  要:水工栈桥桥墩拆除爆破若处理不当,会对临近的水工建筑物造成永久性影响。通过对石门坎水电站栈桥的爆破倾倒历时及振动效应分析,给出了栈桥倾倒历时的求解公式,并指出了减少振动影响的相关措施。结果表明栈桥倾倒历时的实测数据与理论计算基本相符,爆破未对周边建筑物产生有害影响。Improper handling of the demolition blasting of hydraulic trestle pier will cause permanent effect on the hydraulic structure. Based on monitoring data and macroscopic survey, the authors analyzed the toppling duration and vibration effect of the trestle of Shimenkan hydropower station, and gave the calculation formula of toppling duration which is an improvement compared with former methods. Measures of reducing vibration effect were proposed. No adverse impact was exerted on surrounding buildings by the blasting, and the monitored toppling duration data generally agreed with theoretical calculation result.

关 键 词:爆破 栈桥 历时 振动 倾倒 

分 类 号:U448.18[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象