检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]湖南省交通规划勘察设计院,湖南长沙410008
出 处:《公路工程》2012年第3期154-157,共4页Highway Engineering
摘 要:结合广东省佛山市G325九江大桥加固工程实例,介绍了斜拉桥换索、调索设计基本思路、施工顺序及监控情况,提出了增量法换索、调索的设计理念与验证办法,并阐明了尽可能用最小的索力调整值和最少的调索数达到目标线形并有效降低调索风险的调索基本原则。In combing with the engineering practice on reinforcement for Jiujiang Bridge on National Highway 325 in Foshan City of Guangdong Province,this paper firstly introduces the basic concept,construction procedure and monitoring situation for cable change and cable adjustment.And then it proposes a design concept of Increment Method and its verification for cable change and adjustment.Last,it illustrates the cable adjustment principle which is using the minimum cable adjustment force and the least number of adjusted cables to reach the target alignment as well as to reduce the cable adjustment risk as far as possible.
分 类 号:U448.27[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.62