检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄林显[1] 邵景力[1] 崔亚莉[1] 李玲[1] 程汤培[2]
机构地区:[1]中国地质大学(北京)水资源与环境学院,北京100086 [2]北京应用物理与计算数学研究所,北京100086
出 处:《湖南科技大学学报(自然科学版)》2012年第2期83-87,共5页Journal of Hunan University of Science And Technology:Natural Science Edition
基 金:国家重点基础研究发展计划("973"计划)(2010CB428804)
摘 要:在详细分析MODFLOW中P-PCG并行子程序包设计原理的基础上,针对其对层数较少模型加速效果不理想的特点提出了改进方案.在对同一算例数值模型的测试中,P-PCG并行子程序包加速比可以达到1.6,而改进后的P-PCG并行子程序包最大加速比可以达到3.2,明显提高了地下水数值模型的运行速度.The principle of design for parallel P-PCG subroutine package was introduced in detail,and some proposals were suggested,aiming at improving the acceleration performance of groundwater model which contains a few layers.In a comparison test for a calculation example,the speedup of parallel P-PCG subroutine package merely reach up to 1.6,while the speedup of improved parallel P-PCG subroutine package reach up to 3.2,which significantly accelerate the process of numerical simulation of groundwater flow.
关 键 词:地下水数值模拟 OpenMP技术 并行计算 P-PCG并行子程序包
分 类 号:P641.2[天文地球—地质矿产勘探]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117