检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]合肥工业大学土木与水利工程学院,合肥230009
出 处:《安徽建筑工业学院学报(自然科学版)》2012年第3期30-32,37,共4页Journal of Anhui Institute of Architecture(Natural Science)
摘 要:矮塔斜拉桥是介于普通斜拉桥和连续梁桥之间的一种桥型,具有二者的双重特性,同时它属于多次超静定结构,受力复杂。本文结合秋浦河大桥,针对有索区挂篮前移顺序的改变建立了有限元模型,分析了调整前后分别按这两种施工工序进行正装计算时,二者在施工阶段挠度、拉索索力、主梁相关截面应力之间的差别。The extradosed cable-stayed bridge is one type of bridge between cable--stayed bridge and continuous beam bridge, it has dual features of both. Meanwhile,it is a multiple statically indeterminate structure and has a complex stress condition. Combining with the Qiupuhe bridge, this paper established the finite element model which contraposed the changing order of a cable hanging basket moving forword. It analyzed the differences of deflection cable tension and relevant section of girder stress s in construction stage before and after the adjustment when calculating according to the two construction process respectively.
分 类 号:U445[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3