九顶山铜钼矿井下通风系统阻力测定结果分析与对策措施  被引量:4

Analysis and countermeasure to testing results of underground ventilation resistance in Jiudingshan Cu-Mo Mine

在线阅读下载全文

作  者:吴洋[1] 谢贤平[1] 周煜 郭开先 

机构地区:[1]昆明理工大学国土资源工程学院,昆明650093 [2]弥渡县九顶山矿业有限公司,云南弥渡675600

出  处:《有色金属(矿山部分)》2012年第4期67-70,78,共5页NONFERROUS METALS(Mining Section)

摘  要:以九顶山铜钼矿为例,系统介绍矿井通风阻力的测定方法、测点布置及测定路线选择,依据测定结果对矿井通风系统进行合理性分析,并提出降低矿井通风阻力的对策措施。为降低通风电耗、减少通风费用、减少风压损失和保证矿井安全生产提供科学的理论依据。The measuring method of mine ventilation resistance, the layout of the measuring points, and the op- timization of the measuring route are systematically introduced by taking Jiudingshan Cu-Mo Mine for example. The determination results of ventilation resistance are rationally analyzed, and a conclusion of the resolution of the de- crease of ventilation resistance is obtained. The analysis and countermeasures mentioned in this paper provide scien- tific basis for the decline of the ventilation energy cost, expenses, and pressure loss and also provide reliable guaran- tee for the safety of mine production.

关 键 词:矿井通风 通风阻力测定 合理性 对策措施 九顶山铜钼矿 

分 类 号:TD72[矿业工程—矿井通风与安全]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象