气力输送中断后吸收球堆积及重启动试验研究  被引量:3

Experimental Study on Absorption Spheres Pile after the Interruption and Restart of Pneumatic Conveying

在线阅读下载全文

作  者:李天津[1] 陈凤[1] 何学东[1] 陈文胜[1] 孙博[1] 黄志勇[1] 

机构地区:[1]清华大学核能与新能源技术研究院,北京100084

出  处:《核动力工程》2012年第4期54-57,共4页Nuclear Power Engineering

基  金:国家科技重大专项经费资助项目(ZX06901)

摘  要:在以常温常压空气为气源的正压气力输送试验系统中,用玻璃球代替吸收球,研究气力输送中断后吸收球颗粒在输送管侧的堆积及重新启动特性。结果表明:处于稳定输送阶段的气力输送中断后,所用实验装置输送管侧的颗粒平均堆积高度为1172 mm,约占输送管总高度的11%;风机流量减小过程中供料器继续对输送管的供给对颗粒堆积量具有重要影响,稳态气力输送时的输送管内所含颗粒量约占堆积量的10%;重启动过程中气-固两相流段最高压差及稳态输送压差大小与初次启动时相比无变化。The experiments were conducted in a positive pressure system to investigate the absorption spheres pile after the pneumatic conveying interruption and the restart characteristics~ The ambient air was used as the source gas. The absorption spheres were replaced by the glass spheres. The average pile height in the conveying pipe of the experiment system was 1172 mm, which was - 11% of the transport pipe height, as the pneumatic conveying interruption happened at the steady state stage. The continuing spheres supply from the feeder during the blower flow rate decreasing process should be the main factor for the pile up amount of spheres in the conveying pipe. The spheres amount in the steady state conveying line was only - 10% of the pile amount. The maximum and steady state pressure drop of the gas-solid conveying line in the restart process were approximately equal to those of the normal start process.

关 键 词:气力输送 吸收球堆积 重启动 高温气冷堆 

分 类 号:TL351[核科学技术—核技术及应用]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象