检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]广州地下铁道总公司建设总部,广东广州510380 [2]广州地铁设计研究院有限公司,广东广州510010
出 处:《城市道桥与防洪》2012年第7期358-359,367,共3页Urban Roads Bridges & Flood Control
摘 要:珠江三角洲城际快速轨道交通广州至佛山段项目是我国第一条城际轨道项目,线路横跨广州、佛山两市,其中桂城站-南桂路站盾构区间采用日本三菱重工的泥水平衡式盾构机,其选型是根据地层选择匹配,但地质因为突变也可能使盾构机无法适应,此区间硅化构造角砾岩给泥水平衡盾构机造成困扰。该文介绍了采取诸如补充地质勘探、竖井取砾、改进质构设备等技术措施予以补救,从而使该项工程施工顺利进行,并取得较好的经济效益。Zhujiang Delta Intercity Rapid Rail Transit Guangzhou-Foshan Project is the first intercity rail transit project in China to cross two cities of Guangzhou and Foshan, in which the slurry balanced shield machine made in Japan Mitsubishi Heavy Industries is used in the area of Guicheng Station-Nangui Road Station. Its type is selected to match on the stratum, but the geology maybe also makes the shield machine hard to adapt because of its sudden change where the silieified tectonic breccia perplexes the slurry balanced shield machine.
分 类 号:U455.43[建筑科学—桥梁与隧道工程] U455.49[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49