检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]安徽理工大学土木建筑学院,安徽省淮南市232001
出 处:《中国煤炭》2012年第7期42-45,共4页China Coal
摘 要:分析了上覆煤层工作面开采过程中产生的支承压力对下方轨道大巷产生的影响。通过理论计算工作面底板最大破坏深度为18.57m。结合工程地质条件,运用大型数值模拟软件ABAQUS建立三维计算模型对开采过程进行模拟,发现工作面开采会使轨道大巷周边围岩应力提高很多,尤其是顶板范围内的应力水平上升约6MPa。The paper analyzes the impact of the abutment pressure generated in the process of overlying coal seam mining on the under roadway. With theoretical calculation, it works out the depth of the greatest damage on floor is 18.57m. Based on the mining geological conditions of this mine, using numerical simulation software ABAQUS to build 3-D calculating model to simu- late the mining process, the paper gets the result that overlying coal mining will make the surrounding rock stress of the under roadway rise a lot,and the stress within the scope of the roadway roof will especially increase 6MPa.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28