检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]山东建筑大学土木工程学院,济南250101 [2]山东省建筑结构鉴定加固与改造重点实验室,济南250101
出 处:《工业建筑》2012年第7期156-160,共5页Industrial Construction
摘 要:对20世纪60年代建造的某炼钢厂老厂房进行结构安全检测鉴定,混凝土柱、屋架、托架及屋面板等存在顺筋裂缝,混凝土脱落、钢筋锈蚀,柱间支撑及屋盖支撑存在较多缺陷且设置不足,存在较大安全隐患。结合震害经验确定加固设计方案,对混凝土下柱采用外包钢套及加大截面综合法进行加固,对混凝土上柱、屋架及托架采用钢构套加固,混凝土屋面板更换为钢屋面板,完善抗震构造措施,取得了较好的加固效果。Structure inspection and appraisal of a steel plant's old factory building was carried out, the results showed that for reinforced concrete members such as columns, roof trusses, trussed girders and roof panels, cracks occurred along steel bars, peeling of concrete covers and corrosion of steel bars. Also there were many defects of roof bracings and bracings between columns, and the number of bracings was insufficient. There were many serious security troubles to the factory building. A reinforcement design was made based on experiences of earthquake disasters. The lower concrete columns were strengthened with section enlarging and steel plate, the upper concrete columns, roof trusses and trussed girders were strengthened with steel frame. The old concrete roof panels were replaced With the steel ones, and seismic measures were improved. Good result was obtained for the strengthening of the factory building, and the design could he referred by the strengthening of similar structures.
分 类 号:TU746.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229