检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《世界桥梁》2012年第4期46-49,共4页World Bridges
摘 要:闽候新南港大桥主桥为70m+4×120m+70m连续梁桥,桥址处自然条件复杂。为确保该桥施工和建成运营后的抗风稳定性及安全性,采用有限元法对其主桥结构进行动力特性、最大悬臂阶段和成桥阶段的稳定性分析。结果表明:最大悬臂阶段结构稳定性最差(1阶纵向失稳特征值最小为39.13>5,满足规范要求),对结构稳定性起控制作用的是恒载,活载、风荷载等对桥梁最大悬臂状态的稳定性影响不大。The main bridge of New Nangang Bridge in Minhou County is a (70 +4× 120+70) m continuous girder bridge and the enviornmental condition at the bridge site is complicated. To ensure the wind resistant stability and safety of the bridge during construction and in opera- tion, the finite element method was applied to analyze the dynamic performance and the stability of the the main bridge structure in the longest cantilever state and finished bridge state. The re- sults of analysis indicate that the bridge has the poorest structural stability in the longest cantilever state (the I order minimal longitudinal instability egienvalue is 39.13〉5, which meets the code requirement), the dead load plays a dominated role in the control of structural stability, and the live load and wind load have little effect on the stability of the bridge in the longest cantilever state.
关 键 词:连续梁桥 悬臂阶段 成桥阶段 稳定性 分析 有限元法
分 类 号:U448.215[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.46