检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]西安建筑科技大学土木学院,陕西西安710055
出 处:《世界桥梁》2012年第4期50-53,共4页World Bridges
摘 要:为研究高温对桥面铺装层正常工作产生的不利影响,以某连续梁桥为背景,采用有限元模拟分析高温下铺装层各层最大剪应力、路表位移随铺装层温度升高的变化规律。结果表明:铺装层温度升高对路表纵向位移影响很大,而路表横向位移、竖向位移变化相对平缓;高温下同步碎石防水粘结层最大剪应力值较大,易出现剪切破坏;铺装层高温效应沿铺装层深度方向不断减小。In order to study the unfavorable effect of high temperature on tile service of bridge deck pavement, a continuous girder bridge is taken as the study background. The finite element method was adopted to simulate and analyze the maximum shear stress of each pavement layer and the variation of deck surface displacement as the temperature rises. The results indicate that the temperature rising of the pavement layer has great influence on the longitudinal surface dis- placement, but the variation of the transverse and vertical surface displacement is relatively mild~ the maximum shear stress of the synchronous gravel water-proof adhesive layer under high tem- perature is great and is susciptible to shear failure~ and the high temperature effect of pavement gradually decreases along the depth of the pavement.
关 键 词:桥面铺装 同步碎石防水粘结层 剪应力 位移 高温效应 有限元法
分 类 号:U443.33[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.209