检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]水利部水利水电规划设计总院,北京100120 [2]安徽省水利水电勘测设计院,安徽合肥230088
出 处:《水力发电》2012年第8期40-43,共4页Water Power
摘 要:白莲崖水库大坝为安徽省第一座百米级碾压混凝土双曲拱坝。因坝址处河谷较宽,坝顶轴线弧线较长,是目前国内弧高比最大的碾压混凝土拱坝。其两岸山体地形不对称,且受工程调度运用方式特殊性的影响,对拱坝体形设计提出了较高的要求。在拱坝体形设计中,通过对拱坝拱圈的曲率半径和拱坝对称性的优化调整,通过温度仿真计算合理确定坝体分缝及温度控制措施,使坝体应力更加趋于合理。根据原型观测成果分析,拱坝优化设计达到了预期的效果,满足安全运行的要求。The RCC dam of Bailianya Reservoir is the first double-curvature arch dam in Anhui Province with a height more than one hundred meters. The dam has a maximum ratio of thickness to length at present in China as it locates at a wider valley. The asymmetry of two river banks and the specific operation mode put forward a higher requirement on dam shape design. In the design of dam, the tensile stress of dam are controlled by optimizing the radius of curvature and the symmetry of arch dam, and selecting reasonable thermal control measures and joints of dam through temperature simulation calculation. According to the analysis of prototype observation, the design optimization of arch dam achieves desired effect and meets the requirements on safety.
关 键 词:双曲拱坝 碾压混凝土 体形优化 温度控制 原型观测 白莲崖水库
分 类 号:TV642.2[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.146