检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中交第四航务工程勘察设计院有限公司,广东广州510230 [2]中交第二航务工程勘察设计院有限公司广州分公司,广东广州511442
出 处:《水运工程》2012年第7期24-29,共6页Port & Waterway Engineering
摘 要:防波堤顶高程是决定防波堤造价的主要因素之一。为有效控制投资,通过采用斜向浪折减、波浪爬高方法计算堤顶高程,并进行模型验证分析。得出在2 a一遇的波浪作用下,防波堤顶高程的降低对港内泊稳条件的影响很小。因此,在确定防波堤顶高程时应结合其功能特点、使用、防护要求,选择合适防波堤高程控制标准及计算方法,进而确定防波堤的顶高程。Breakwater top elevation is one of the main factors determining the breakwater cost. In order to control the investment, this paper calculates the top elevation and model validation using oblique wave reduction, and by wave run-up method. It is concluded that the reduction of the breakwater top elevation has little impact on the inner-harbor mooring conditions under 2-year frequency wave action. Therefore, to determine the breakwater top elevation, we shall consider its functional charaeteristies and utilization and protection requirements to select appropriate breakwater elevation control standards and calculation methods, and then determine the top elevation of the breakwater.
关 键 词:广澳港区 防波堤顶高程 斜向浪折减 波浪爬高 波浪整体物理模型试验
分 类 号:U656.2[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.166