检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:冯福平[1] 赵恩远[2] 艾池[1] 李玉伟[1] 金春玉[3]
机构地区:[1]东北石油大学提高油气采收率教育部重点实验室,黑龙江大庆163318 [2]大庆油田有限责任公司井下作业分公司,黑龙江大庆163414 [3]河北联合大学矿业工程学院,河北唐山063009
出 处:《石油钻采工艺》2012年第4期36-39,共4页Oil Drilling & Production Technology
基 金:黑龙江省教育厅科学技术研究项目"应用深冷技术改善钻铤井下工作性能理论研究"(编号:12511017)资助
摘 要:蠕变地层套管应力计算是采取套损预防措施的依据,目前采用非均匀地应力作为套管水泥环力学模型边界条件的套管应力计算方法与实际情况不符。提出了蠕变地层套管应力计算应将均匀地应力作为其边界条件的有限元力学模型,并分析了水泥环椭圆度和弹性模量对套管应力的影响:当水泥环弹性模量小于等于地层弹性模量时,套管最大应力出现在最小水平地应力方向,反之则出现在最大水平地应力方向;套管峰值应力随着水泥环椭圆度的增大而增加,套管由缩颈损坏转变为挤扁损坏;蠕变地层水泥环弹性模量与地层弹性模量和井眼椭圆度之间存在合理的匹配关系,改变水泥环弹性模量是降低蠕变地层套管应力的最有效方法。该规律的得出有助于加深套损机理的认识和套损预防措施的实施。Casing stress calculations in creep formation are the basis to take casing failure prevention measures. The current casing stress calculation method, which uses non-uniform formation stress as the boundary condition of cement sheath mechanical model, is inconsistent with the actual situation. The finite element mechanics model is put forward, which uses uniform formation stress as the boundary condition of casing stress calculation in creep formation. And the effect of cement sheath ellipticity and elastic modulus on the casing stress is analyzed. When the cement sheath elastic modulus is less than or equal to the formation elastic modulus, the maximum casing stress is in the same direction with the minimum horizontal in-situ stress, and on the contrary, it is in the same direction with the maximum horizontal in-situ stress. The peak casing stress increases as the cement sheath ellipticity increases, so the casing breaking may change from necking to collapsing. The cement sheath elastic modulus has a reasonable matching relationship with formation elastic modulus and borehole ellipticity, and it is the most effective way to reduce casing stress by changing the cement sheath elastic modulus in creep formation. The law would help deepen the understanding of casing failure mechanism and the implementation of prevention measures.
分 类 号:TE931.2[石油与天然气工程—石油机械设备]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222