检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周杰华
出 处:《福建建筑》2012年第7期79-80,共2页Fujian Architecture & Construction
摘 要:介绍厦漳高速公路扩建工程漳州段南港特大桥K496+527~K497+757段,处于九龙江紫泥镇河道场地,桩基施工平台用回填土填方而成,桩基孔径较大,桩机锤头均在8T以上,施工时震动较大;本文介绍桩机在此种回填土平台施工时,如何解决桩机下陷偏位、护筒下陷、护壁塌方及钢筋笼下陷等方法,使后面同等场地、同等工艺的工程能够避免发生上述问题,减少机械台班等不必要的损失。This text introduces that Nangang specially long span bridge of Zhangzhou from K496+527 to K497+757 lies in the river way terrace of Zini town near Jiulong river in the Xiazhang highway expansion program.Its pile foundation work is made up of backfill and pile foundation aperture is large and its planishes of pile driver are all above 8T.So the shake is stong when it is constructed.This text also introduces the way to solve subsidence of the pile driver 、pile casing、breast wall and steel reinforcement cage when the pile driver constructs in this terrace of backfill so as to advoid that kind of construction taking place as well as reduce the unnecessary lost of machine-team.
分 类 号:TU753.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28