检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]广西大学资源与冶金学院
出 处:《现代矿业》2012年第7期7-9,共3页Modern Mining
摘 要:某矿在实施大直径深孔阶段空场法开采的过程中,根据矿体的赋存条件、开采经济上的可行性和生产管理等情况,采取垂直矿体走向和沿矿体走向两种布置矿块形式。在矿岩力学性质研究的基础上,运用有限差分软件FLAC3D对该矿大直径深孔阶段空场法采场结构参数进行数值模拟研究,以确定矿块、矿房、矿柱等参数。During the process of implement of large-diameter deep-hole stage open stoping method of a mine, according to the occurrence condition of ore body, feasibility of mining economic, production management and other situation, vertical ore body to the layout of the mine block and along the ore body to layout of the mine block were adopted. On the basis of rock mechanical properties study, numerical simulation was done on stope structural parameters of large-diameter deep-hole stage open stoping method of this mine by FLAC3D, and the parameters of ore block, ore room, pillar were determined.
关 键 词:大直径深孔阶段空场法 矿柱参数 数值模拟
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.16.107.122