Bending behavior of double-row stabilizing piles with constructional time delay  被引量:12

Bending behavior of double-row stabilizing piles with constructional time delay

在线阅读下载全文

作  者:Yang YU Yue-quan SHANG Hong-yue SUN 

机构地区:[1]College of Civil Engineering and Architecture,Zhejiang University,Hangzhou 310058,China [2]Department of Ocean Science and Engineering,Zhejiang University,Hangzhou 310058,China

出  处:《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》2012年第8期596-609,共14页浙江大学学报(英文版)A辑(应用物理与工程)

基  金:Project supported by the National Natural Science Foundation of China (No. 40972187);the Key Innovation Team Support Project of Zhejiang Province (No. 2009R50050)

摘  要:The bending behavior of double-row stabilizing plies is associated with the constructional time delay(CTD),which can be defined as the time interval between the installations of the front stabilizing pile and the rear stabilizing pile.This paper investigates the effect of CTD on the bending moments of double-row stabilizing piles and a method for determining the optimal CTD is proposed.The stabilizing pile is modeled as a cantilever pile embedded in the Winkler elastic foundation.A triangular distributed earth pressure is assumed on the pile segment in the sliding layer.The front stabilizing pile and the rear stabilizing pile are connected by a beam with pinned joints.The analytical solutions of bending moments on the front and the rear stabilizing piles are derived and the accuracy of bending moment solutions is validated by comparing the tensile strain measured from the Hongyan landslide project,Taizhou,Zhejiang,China.It is concluded that CTD has a significant influence on the bending moments of double-row stabilizing piles.An optimal CTD can be obtained when the maximum tensile stress in the front stabilizing pile is equal to that in the rear stabilizing pile,which is 1.4 months for the Hongyan landslide project.The bending behavior of double-row stabilizing plies is associated with the constructional time delay (CTD), which can be defined as the time interval between the installations of the front stabilizing pile and the rear stabilizing pile. This paper investigates the effect of CTD on the bending moments of double-row stabilizing piles and a method for determining the optimal CTD is proposed. The stabilizing pile is modeled as a cantilever pile embedded in the Winkler elastic foundation. A triangular distributed earth pressure is assumed on the pile segment in the sliding layer. The front stabilizing pile and the rear stabilizing pile are connected by a beam with pinned joints. The analytical solutions of bending moments on the front and the rear stabilizing piles are derived and the accuracy of bending moment solutions is validated by comparing the tensile strain measured from the Hongyan landslide project, Taizhou, Zhejiang, China. It is concluded that CTD has a significant influence on the bending moments of double-row stabilizing piles. An optimal CTD can be obtained when the maximum tensile stress in the front stabilizing pile is equal to that in the rear stabilizing pile, which is 1.4 months for the Hongyan landslide project.

关 键 词:Subgrade reaction LANDSLIDE Stabilizing pile Constructional time delay (CTD) Bending moment 

分 类 号:TU473[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象