检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国地质大学〈武汉〉工程学院,湖北武汉430074
出 处:《探矿工程(岩土钻掘工程)》2012年第7期37-40,共4页Exploration Engineering:Rock & Soil Drilling and Tunneling
摘 要:以长春市伊通河排水管网改造工程为例,通过现场实测中粗砂地层条件下采用泥水平衡顶管顶进过程中顶进力的变化情况,系统研究了影响顶进力的因素及其变化规律,并对顶进力的计算进行了理论分析,与实际顶进力进行了对比,最后运用Matlab软件对实测数据进行数值分析,得出在该地质条件下的泥水平衡顶管摩阻力和顶进力计算公式。Take the example of reconstruction project of Yitong River drainage pipelines in Changchun, based on the change of jacking force measured in jacking process by using slurry balance pipe jacking in medium coarse sand formation, the factors affecting jacking force and the changing rule were systematically studied, and the calculation of jacking force were analyzed and compared to the field measured data, finally the measured data were numerically analyzed with Matlab software, calculation formulas of jacking force and friction under the condition of medium coarse sand formation were deduced.
分 类 号:P634[天文地球—地质矿产勘探]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28