作 者:许启云
机构地区:[1]浙江华东建设工程有限公司,浙江杭州310030
出 处:《探矿工程(岩土钻掘工程)》2012年第7期63-66,共4页Exploration Engineering:Rock & Soil Drilling and Tunneling
摘 要:某电站左岸溢洪道为优化灌浆设计方案,需要对左岸溢洪道布置钻孔进行综合勘察,并在此基础上按照灌浆设计要求进行单孔灌浆试验。为确保施工质量,事先对工艺流程进行优化,同时精选了设备和人员,并严格按照灌浆规范以及符合设计要求的情况下,通过在溢洪道启闭机闸墩、溢洪道二侧、溢流堰等具有代表性的部位进行单孔灌浆试验,取得了良好的灌浆效果,为完善灌浆设计方案提供了依据。To optimize grouting design scheme of the left spillway for a power station, comprehensive survey was made lor borehole arrangement and single borehole grouting tests were demanded. In order to ensure construction quality, the process flow was optimized, the equipment and personnel were strictly selected and single borehole grouting tests were made at representative regions according to the grouting specifications and design requirements, such as gate hoist, 2 sides of spillway and overflow weir with good grouting effects, which could be the basis for sound grouting design scheme.
分 类 号:TV543[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249