麦垛山矿井副立井井筒上段井壁保护技术措施  被引量:2

Upper Wall Technical Protection Measures for Auxiliary Vertical Shaft of Mai Duoshan Coal Mine

在线阅读下载全文

作  者:侯世占[1] 

机构地区:[1]中煤国际北京华宇工程有限公司西安分公司,陕西西安710075

出  处:《煤矿现代化》2012年第4期11-13,共3页Coal Mine Modernization

摘  要:麦垛山矿井副立井井筒按照普通凿井法施工至-251m时,因井筒涌水量大,无法继续施工。经论证决定井筒下段(-251m以下)采用冻结法施工,并采取适当加大冻结圈径、采用差异冻结方式、施工泄压孔等措施,对已施工井筒进行保护,取得了较好的效果,已施工井筒没有受到冻结工程的影响和破坏。Maiduoshan Mine's Vice Mine Shaft construction in accordance with the ordinary sinking to-25 lm, due to borehole water in- flow volume, can not continue with the work. It has been demonstrated, the decision wellbore under paragraph (-251m) using the freezing method construction, and to take appropriate increase the freeze circle diameter, using the difference measures to freeze the way, construction and pressure relief hole, protection of Construction wellbore,Achieved good resuhs, has been the construction of the wellbore is not subject to freeze the project impact and damage.

关 键 词:上段井壁 冻结圈径 泄压孔 

分 类 号:TD265.4[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象