作 者:侯世占[1]
机构地区:[1]中煤国际北京华宇工程有限公司西安分公司,陕西西安710075
出 处:《煤矿现代化》2012年第4期11-13,共3页Coal Mine Modernization
摘 要:麦垛山矿井副立井井筒按照普通凿井法施工至-251m时,因井筒涌水量大,无法继续施工。经论证决定井筒下段(-251m以下)采用冻结法施工,并采取适当加大冻结圈径、采用差异冻结方式、施工泄压孔等措施,对已施工井筒进行保护,取得了较好的效果,已施工井筒没有受到冻结工程的影响和破坏。Maiduoshan Mine's Vice Mine Shaft construction in accordance with the ordinary sinking to-25 lm, due to borehole water in- flow volume, can not continue with the work. It has been demonstrated, the decision wellbore under paragraph (-251m) using the freezing method construction, and to take appropriate increase the freeze circle diameter, using the difference measures to freeze the way, construction and pressure relief hole, protection of Construction wellbore,Achieved good resuhs, has been the construction of the wellbore is not subject to freeze the project impact and damage.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112