检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]贵州大学矿业学院,贵州贵阳550025 [2]贵州大学瓦斯灾害防治与煤层气开发研究所,贵州贵阳550025
出 处:《煤炭工程》2012年第8期48-51,共4页Coal Engineering
基 金:贵州省教育厅自然科学重点项目(黔教科[2011]034号);贵州省科技厅工业攻关项目(黔科合GY[2012]3054);贵州大学引进人才科研基金资助(贵大人基合字[2010]002号)
摘 要:文章选定矿井通风系统相对稳定时期为核定时期,通过计算坪土煤矿各采掘工作面、硐室及备用工作面需风量,确定矿井需风量,根据矿井通风能力计算,确定坪土煤矿合理的采掘比为1∶3,矿井通风能力为120万t/a,并从矿井通风动力、用风地点有效风量、矿井通风网络能力、稀释瓦斯能力等方面验证了矿井通风能力为120万t/a。A relative stable period of the mine ventilation system was selected as a rated period. With the calculation on the required ventilation value of each mining and exeavatiou face, chamber and standby working face in Pingtu Mine, the mine required ventilation value could be set up. According to the calculation of the mine ventilation capacity, the rational mining and excavation ratio of the Pingtu Mine determined was 1 : 3 and the mine ventilation capacity was 1.20 million t/a. The mine ventilation capacity of 1.20 million t/a was verified with the mine ventilation power, the effective ventilation value at the required ventilation place, mine ventilation network capacity, diluted gas capacity and others.
分 类 号:TD722[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.225.234.109