深部高应力软岩硐室围岩控制技术  被引量:3

Rock Control Technology of Soft Rock Chamber with Deep High Stress

在线阅读下载全文

作  者:曹明[1] 荆升国[1] 谢文兵[1] 费小保[1] 

机构地区:[1]中国矿业大学矿业工程学院,江苏徐州221008

出  处:《煤矿安全》2012年第8期92-94,共3页Safety in Coal Mines

摘  要:裴沟煤矿42采区泵房围岩岩性差,服务年限长,埋藏深应力大且受断层影响,残余构造应力也大。通过分析原U型钢棚支护,巷道掘出后不久即严重变形的原因,提出了通过围岩注浆,顶帮部棚索协同支护增加结构稳定性,提高其承载能力,底板锚网索支护控制底鼓。通过方案实施后的现场实测,该方案有效控制了围岩变形。The pumping stations in Peigou 42 mining area, with poor surrounding rock, long years of service, deep buried and big stress, is influenced by fault and has big residual tectonic stress. The paper analyzed the U - shaped steel roof support and the severe deformation reason after the roadway dug up shortly. Through the surrounding rock grouting, and the shelf cable collaborative support in roof and sides parts to increase the structural stability, its carrying capacity was enhanced, and heaving floor was controlled by anchors and cables support in floor. Field measurements after the implementation of the program showed that the program had effectively con- trolled the surrounding rock deformation.

关 键 词:深部高应力 断层 注浆 棚索协同 底鼓 

分 类 号:TD353[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象