检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:金珍宏[1]
机构地区:[1]中国水电顾问集团华东勘测设计研究院,浙江杭州310014
出 处:《水电能源科学》2012年第8期204-207,共4页Water Resources and Power
摘 要:根据《水电工程可行性研究报告编制规程》的相关规定,并结合白鹤滩水电站设计要求,研究了白鹤滩水电站施工期施工设备选型及其配套、施工技术及工艺选择、施工辅助生产系统及其施工工厂设计中涉及的节能技术及措施。依据水电工程具有的普遍适应性,对水电站施工期可采取的节能技术及措施的研究思路及方法进行了探讨,为研究类似水电工程的节能技术及措施提供了借鉴与参考。According to the requirements of Code for preparation of hydropower project feasibility study report, com bined with the design of Baihetan hydropower station, this article mainly focuses on the research of energy saving tecbnol ogies and measures for selection of construction equipment, technology and process of construction, auxiliary production system during the construction period. The points of the study have universal adaptability for hydropower project. The ideas and methods of energy saving technologies and measures cart be as referenced and quoted in the similar projects.
分 类 号:TV737[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117