白鹤滩水电站施工期涉及的节能技术及措施  被引量:5

Energy Saving Technology and Measures for Construction of Baihetan Hydropower Station

在线阅读下载全文

作  者:金珍宏[1] 

机构地区:[1]中国水电顾问集团华东勘测设计研究院,浙江杭州310014

出  处:《水电能源科学》2012年第8期204-207,共4页Water Resources and Power

摘  要:根据《水电工程可行性研究报告编制规程》的相关规定,并结合白鹤滩水电站设计要求,研究了白鹤滩水电站施工期施工设备选型及其配套、施工技术及工艺选择、施工辅助生产系统及其施工工厂设计中涉及的节能技术及措施。依据水电工程具有的普遍适应性,对水电站施工期可采取的节能技术及措施的研究思路及方法进行了探讨,为研究类似水电工程的节能技术及措施提供了借鉴与参考。According to the requirements of Code for preparation of hydropower project feasibility study report, com bined with the design of Baihetan hydropower station, this article mainly focuses on the research of energy saving tecbnol ogies and measures for selection of construction equipment, technology and process of construction, auxiliary production system during the construction period. The points of the study have universal adaptability for hydropower project. The ideas and methods of energy saving technologies and measures cart be as referenced and quoted in the similar projects.

关 键 词:节能技术 节能措施 施工期 白鹤滩水电站 

分 类 号:TV737[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象