检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《电力建设》2012年第8期40-43,共4页Electric Power Construction
摘 要:针对500kV变电站220kV架空出线多所带来的设备布置难题,对500kV智能变电站220kV复合组合电器(hybrid gas insulated switchgear,HGIS)配电装置进行了间隔设备配置整合、布置形式和构架设计。优化布置方案运用了间隔设备整合与布置优化、大跨度母线梁以及联合构架设计、局部双层出线设计等手段,与通用设计500-B-4方案相比,优化布置方案具有设备投资基本相当、占地面积节省34.1%、结构用钢量减少28.6%等优势。According to the fact that 220 kV outgoing lines were overhead in most of 500 kV substation, some improvement measures were implemented for the 220 kV hybrid gas insulated switchgear ( HGIS ) distribution device in 500 kV intelligent substation, such as the configuration integration for interval equipment, the optimization design for layout and framework. The layout optimization scheme included: the configuration integration and optimization for interval equipment, the design of large span bus beam and united framework, partial double outgoing line within single bay, and so on. Compared with the 500 - B - 4 universal design, this optimization scheme has advantages of saving 34.1% occupied area and 28.6% structure steel consumption with same equipment investment.
关 键 词:智能变电站 复合组合电器(HGIS) 配电装置 设计优化
分 类 号:TM75[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249