东北电网峰谷差及水电规划开发  

The Difference between Peak and Valley of the Northeast Power Pool and Hydropower Planning and Development

在线阅读下载全文

作  者:刘凤林[1] 任井利[1] 

机构地区:[1]桓仁发电厂,辽宁桓仁117201

出  处:《水电能源科学》2000年第2期66-68,共3页Water Resources and Power

摘  要:随着社会经济的发展和电力市场的变化 ,东北电网峰谷差不断加大 ,供需矛盾日益尖锐 ,规划水电开发项目 ,开发建设抽水蓄能、扩建混合抽水蓄能、扩建机组、实施老旧机组改造 ,以增加水电装机容量 ,提高系统调峰能力 。With the development of society and economy and the change of the power market, the difference between peak and valley of the Northeast power pool is steadily increasing and the contradiction between supply and demand is becoming increasingly acute. It is therefore imperative to make plans for hydropower development projects and those for building pumped storage power stations, extending mixed pumped storage stations and pumped storage groups as well as innovating old ones so as to increase the hydropower installed capacity, improve the peak modulating capability and meet the demand of the power market.

关 键 词:东北电网 峰谷差 水电规划 开发建设 

分 类 号:TV212[水利工程—水文学及水资源] TM727.2[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象