检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:于志勇[1] 姚琳[2] 冯礼奎[1] 田刚强[1]
机构地区:[1]浙江省电力试验研究院,浙江杭州310014 [2]杭州市环境监测中心站,浙江杭州310007
出 处:《工业水处理》2012年第8期96-98,共3页Industrial Water Treatment
摘 要:分析了某电厂化学水处理混床制水周期突降的原因,从仪表测量、设备状况、原水水质、再生用酸碱质量、再生除盐水水质、再生工艺控制、混床树脂状态和混脂用气等可能影响制水周期的因素中进行查找,根据分析结果制定出解决混床制水周期突降的措施,为类似水处理系统异常时的分析处理提供借鉴。The causes of the sudden shortening of water-making period of the mixed bed for chemical water treatment at an electric power plant have been analyzed. The analysis was proceeded from the factors that have effects on water-making period, such as instrument measurements, equipment status, source water quality, quality of acid and base for regeneration, quality of regeneration desahed water, regeneration process control, resin state in mixed bed, gas for mixed lipid, etc. Based on the results of analysis, the measures for solving the problem of the sudden shorten- ing of water-making period of the mixed bed are set down, offering reference for analyzing similar unusual situations in water treatment systems.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28