某高层建筑冲钻孔灌注桩桩端未达持力层的分析和处理  

The analyzing and treatment on tip of pile that not reaching to the bearing stratum in a high rise building project using cast-in-place pile

在线阅读下载全文

作  者:林建明 

机构地区:[1]福建七建集团有限公司,福建漳州363000

出  处:《福建建筑》2012年第8期83-85,共3页Fujian Architecture & Construction

摘  要:某高层建筑为31层剪力墙结构,设计采用墙下冲钻孔灌注桩基础,桩端持力层为碎块状强风化花岗岩或中风化花岗岩。经钻芯检测,桩端全断面未达持力层,未能满足设计要求。通过一系列分析比较,本文提出几种设计处理方法,经静载试验,单桩竖向承载力及桩端进入持力层满足设计要求。既经济又安全,较好地满足了工程要求。IN a high--rise building of 31 floors with shear wall structure, the cast--in--place pile is used in the pile foundation. The bearing stratum for the tip of pile are highly weathered granite and medium weathered granite, after pile test, it was found that the tip of the pile can not totally reach to the bearing stratum and because of this it can not meet the requirement of design. By comparing and analyzing, this article puts forwards a few treatments to deal with the problem. After dead load test, the bearing capacity of single pile and tip of pile right onto the bearing stratum are meet the requirement of design. It is economic and safety for the requirements of the project.

关 键 词:冲钻孔灌注桩 高压注浆 桩筏基础 

分 类 号:TU753.2[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象