项目缓冲设置方法及其评价指标改进  被引量:40

An improved approach for project buffer sizing and evaluation

在线阅读下载全文

作  者:施骞[1] 王雅婷[1] 龚婷[1] 

机构地区:[1]同济大学经济与管理学院,上海200092

出  处:《系统工程理论与实践》2012年第8期1739-1746,共8页Systems Engineering-Theory & Practice

基  金:国家自然科学基金(70972072);上海市重点学科资助项目(B310)

摘  要:论文提出了项目不确定条件下的缓冲区设置方法.该方法综合考虑资源紧张度、网络计划复杂度和项目经理风险偏好等影响因素,解决了资源紧张度难以量化和统一的问题,同时考虑用资源的可替代性解决资源紧张问题.通过模拟实验,将新方法与传统C&PM以及RSEM方法对不同可替代方案进行了比较,为选择最优方案提供参考.分析时不仅采用了传统评价指标,还引入了成本指标以衡量工期与成本是否均衡优化的问题.实验结果表明本文所提的新方法兼具有效性和实用性.The authors have put forward an improved approach for project buffer sizing based on the resource constrains, logical complexity as well as project managers' risk preference by using fuzzy logic theory. Taking resource substitutability into consideration, the authors have integrated the optimization and tradeoff between cost and schedule into the indicators for the evaluation of critical chain scheduling. By means of experimental study, the new approach has been verified to be more effective and efficient than the traditional C&=PM and RSEM approach.

关 键 词:关键链 缓冲设置 可替代性 成本指标 

分 类 号:C935[经济管理—管理学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象