检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]南阳师范学院土木建筑工程学院,河南南阳473061
出 处:《人民长江》2012年第15期20-23,共4页Yangtze River
摘 要:浅埋暗挖隧道在施工过程中不可避免地对地层产生扰动,以长春火车站站场地下通道的浅埋暗挖法施工为例,通过采取预加固和强支护施工措施,并对通道开挖过程中的沉降进行严密的监测,严格控制沉降值,有效保证了通道施工的安全。从沉降控制基准值的确定、监控量测系统设计、沉降控制措施等方面论述了该隧道施工的关键点。通道的开挖支护设计与施工监测方案对相似工程具有一定的借鉴性。The construction of shallow tunnel excavation may induce disturbance of the surface ground inevitably. In the under- pass construction of Changchun Railway Station square, we have taken the measures such as pre - reinforcement and strong sup- port, intensifying monitoring to ensure the construction safety. We discuss the key points for the underpass construction, inclu- ding settlement control standard, monitoring system design, settlement control measures. The construction, monitoring and support design have the certain reference value for similar projects.
关 键 词:浅埋暗挖 地表沉降 监控量测 测点布置 隧道施工
分 类 号:U455[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.114